Poch participates in emblematic project for Metro, developing the electrical project of Lines 4 and 4A.
Description of the Project:
For Metro S.A. the Line 4 and Line 4A project meant practically the duplication of its total lines extension, reaching two of the most populated municipalities of the country: La Florida and Puente Alto.
The project included all the electrical systems of the new lines, developing the electrical detail engineering of the SEAT substation, the Loading Distribution Center (CDC) of Vicuña Mackenna, the 20Kv distribution and the 750 VDC traction.
In addition the signposting and electric control system engineering was carried out in all the voltage levels, along with the development and start-up of the SEAT control software and the CDC of V. Mackenna.
Throughout the whole project Poch provided assistance in the assembly on site and the start-up.
Our importance:
Poch through Siemens participates one in the main transportation projects in the country, counting with an experienced work team in Metro projects.
Essential benefit:
The project was made in direct contact with Metro personnel fulfilling the high standards of security and quality that a of public transportation project involves.